Construction is underway on the Grove & College Parking Lot Project, which will install a 24-space permeable paver public parking lot behind 101 South Main Street.
Starting on Monday, February 19, West College Street between Main Street and Grove Street will be closed between 7:00 am and 5:30 pm as our contractor excavates West College Street to install a stormwater line. The road will reopen at 5:30 pm each day during construction. This work is expected to take about one week.